Competition Pool in Reigate
The pool was originally constructed in the late 1970s and had not had significant works done since that time. The pool was heated by two oil-fired boilers and had a basic air handling system without...
Read MoreThe pool was originally constructed in the late 1970s and had not had significant works done since that time. The pool was heated by two oil-fired boilers and had a basic air handling system without...
Read MoreAn exciting recently completed project to convert an existing much unloved and unused pool into something more suiting to a beautiful London home. We worked closely with the client to transform an old...
Read MoreFrom the summer of 2019, Sean began the designs for the restoration/refurbishment of Shere swimming pool, which was originally constructed in 1875 on the Estate of Sir Arthur Russel. Focus The...
Read MorePPE Ltd have been involved with the site management team at Holy Cross for a number of years, training the team on PWTAG accredited national pool plant operator certificate courses and providing pool...
Read MoreSean Brydges met the site manager for Downsend school whilst tutoring a PWTAG accredited national pool plant operators certificate course in August 2018. Following the industry standards discussed...
Read MoreAt the start of 2019 PPE Ltd were commissioned by UK Diveworks to upgrade the pool plant filtration and automatic chemical dosing systems for a 1962 swimming pool. UK Diverworks commercial...
Read MoreJohn Blazeby first met the site team for PWTAG accredited pool plant operator training in the spring of 2019. Services provided: Audit of the pool systems Health & Safety assessment and...
Read MoreThis pool in South London has had many problems that we had been tasked to rectify in order to keep the pool safe and operational. The pool is large (450 tonnes) and has a large bather capacity so it...
Read More